Your most trusted training and consulting partner
Electrical and Instrumentation
Found
461 Results
Page
1 of
1
Course Title | Start Date | Duration | Location | Course Code | Registration |
---|---|---|---|---|---|
Advanced primary distribution stations | 07-Jan-24 | 5 Days | Cairo- Egypt | ELC-001 | |
Water Meters – Testing, Maintenance | 07-Jan-24 | 5 Days | Cairo- Egypt | ELC-002 | |
Verification and Certification of Electrical Installations | 07-Jan-24 | 5 Days | Cairo- Egypt | ELC-003 | |
The foundations of electricity, methods of protection | 07-Jan-24 | 5 Days | Cairo- Egypt | ELC-004 | |
The basics of measuring and testing devices | 07-Jan-24 | 5 Days | Cairo- Egypt | ELC-005 | |
Tests and deliveries for electrical power systems | 07-Jan-24 | 5 Days | Dubai - (UAE) | ELC-006 | |
Security and electrical safety system | 14-Jan-24 | 5 Days | Cairo- Egypt | ELC-007 | |
Protective grounding systems in electrical networks | 14-Jan-24 | 5 Days | Cairo- Egypt | ELC-008 | |
Preparing Certified Practitioner in Energy Management Systems | 14-Jan-24 | 5 Days | Dubai - (UAE) | ELC-009 | |
Preparing a site electrical engineer | 14-Jan-24 | 5 Days | Dubai - (UAE) | ELC-0010 | |
Plant electrical power operation & maintenance | 14-Jan-24 | 5 Days | Cairo- Egypt | ELC-0011 | |
Periodic Initial Inspection, Testing and Condition Reporting | 14-Jan-24 | 5 Days | Kuala Lumpur | ELC-0012 | |
Operational Safety and Control in Oil & Gas | 21-Jan-24 | 5 Days | Cairo- Egypt | ELC-0013 | |
Control and Protection Systems | 21-Jan-24 | 5 Days | Cairo- Egypt | ELC-0014 | |
Control and Protection Systems | 21-Jan-24 | 5 Days | Dubai - (UAE) | ELC-0015 | |
Occupational safety from electrical hazards | 21-Jan-24 | 5 Days | Cairo- Egypt | ELC-0016 | |
Operational Safety and Control in Oil & Gas | 21-Jan-24 | 5 Days | Dubai - (UAE) | ELC-0017 | |
Maintenance course for electrical networks | 21-Jan-24 | 5 Days | Cairo- Egypt | ELC-0018 | |
Maintenance and examination of electrical transformers | 21-Jan-24 | 5 Days | Cairo- Egypt | ELC-0019 | |
Inspection & Maintenance for electrical networks | 21-Jan-24 | 5 Days | Cairo- Egypt | ELC-0020 | |
IEC Standards Home Electrical Appliances Testing | 21-Jan-24 | 5 Days | Cairo- Egypt | ELC-0021 | |
HVAC Equipment Maintenance & Testing | 21-Jan-24 | 5 Days | Dubai - (UAE) | ELC-0022 | |
Flexible electrical network & emergency operations | 21-Jan-24 | 5 Days | Dubai - (UAE) | ELC-0023 | |
Failure analysis in electrical industrial networks | 21-Jan-24 | 5 Days | Cairo- Egypt | ELC-0024 | |
EPC Contracts for power & energy projects | 21-Jan-24 | 5 Days | Dubai - (UAE) | ELC-0025 | |
Electrical meter installation – maintenance & Testing | 21-Jan-24 | 5 Days | Cairo- Egypt | ELC-0026 | |
Electrical measurements and control circuits | 21-Jan-24 | 5 Days | Dubai - (UAE) | ELC-0027 | |
Control and Protection Systems | 21-Jan-24 | 5 Days | Cairo- Egypt | ELC-0028 | |
Electrical equipment and control systems | 21-Jan-24 | 5 Days | Dubai - (UAE) | ELC-0029 | |
Control and Protection Systems | 28-Jan-24 | 5 Days | Dubai - (UAE) | ELC-0030 | |
Electrical drawings and control systems | 28-Jan-24 | 5 Days | Cairo- Egypt | ELC-0031 | |
Operational Safety and Control in Oil & Gas | 28-Jan-24 | 5 Days | London - United Kingdom | ELC-0032 | |
Operational Safety and Control in Oil & Gas | 28-Jan-24 | 5 Days | Dubai - (UAE) | ELC-0033 | |
Electrical cables: design – test – installation – connection | 28-Jan-24 | 5 Days | Cairo- Egypt | ELC-0034 | |
Electric power systems and data technology | 28-Jan-24 | 5 Days | Dubai - (UAE) | ELC-0035 | |
Electric power systems – protection, control | 28-Jan-24 | 5 Days | Cairo- Egypt | ELC-0036 | |
Electric motors protection and maintenance | 28-Jan-24 | 5 Days | Dubai - (UAE) | ELC-0037 | |
Diagnosing & troubleshooting electrical faults | 28-Jan-24 | 5 Days | Cairo- Egypt | ELC-0038 | |
Diagnosing & troubleshooting electrical faults | 28-Jan-24 | 5 Days | Dubai - (UAE) | ELC-0039 | |
Designing electrical installations in projects | 28-Jan-24 | 5 Days | Cairo- Egypt | ELC-0040 | |
Design, installation and testing of floor cables | 04-Feb-24 | 5 Days | Dubai - (UAE) | ELC-0041 | |
Design and Verification of Electrical Installations | 04-Feb-24 | 5 Days | Cairo- Egypt | ELC-0042 | |
Control and operation systems for electric lifts | 04-Feb-24 | 5 Days | Cairo- Egypt | ELC-0043 | |
Calibration and testing of digital meters | 04-Feb-24 | 5 Days | Cairo- Egypt | ELC-0044 | |
Advanced primary distribution stations | 04-Feb-24 | 5 Days | Cairo- Egypt | ELC-0045 | |
Electrical Drawings and Documentation | 04-Feb-24 | 5 Days | Cairo- Egypt | ELC-0046 | |
Earthing of Electrical Networks and Cables | 11-Feb-24 | 5 Days | Cairo- Egypt | ELC-0047 | |
Underground Cables / Problems and Solutions | 11-Feb-24 | 5 Days | Cairo- Egypt | ELC-0048 | |
Maintenance of Electrical Equipment and Substation | 11-Feb-24 | 5 Days | Cairo- Egypt | ELC-0049 | |
Data Communication Advanced Topics & Applications | 11-Feb-24 | 5 Days | Cairo- Egypt | ELC-0050 | |
Illumination Systems | 11-Feb-24 | 5 Days | Dubai - (UAE) | ELC-0051 | |
Process Simulation | 11-Feb-24 | 5 Days | Cairo- Egypt | ELC-0052 | |
Protection Fundamentals of E.P.S | 11-Feb-24 | 5 Days | Dubai - (UAE) | ELC-0053 | |
Power Factor Improvement and Energy Conservation | 11-Feb-24 | 5 Days | Cairo- Egypt | ELC-0054 | |
Maintenance and Troubleshooting of UPS System (Uninterrupted Power Supply) and Battery Power Supply | 18-Feb-24 | 5 Days | Dubai - (UAE) | ELC-0055 | |
Troubleshooting of Electrical Power System | 18-Feb-24 | 5 Days | Dubai - (UAE) | ELC-0056 | |
Distribution Networks : Operation and Maintenance | 18-Feb-24 | 5 Days | Cairo- Egypt | ELC-0057 | |
Wireline Techniques | 18-Feb-24 | 5 Days | Dubai - (UAE) | ELC-0058 | |
Protective Systems of Electrical Network | 18-Feb-24 | 5 Days | Cairo- Egypt | ELC-0059 | |
Control Centers in Distribution Networks | 18-Feb-24 | 5 Days | Cairo- Egypt | ELC-0060 | |
Recent Role of Circuit Breaker and Control | 25-Feb-24 | 5 Days | Cairo- Egypt | ELC-0061 | |
Improving Performance of Generation Stations | 25-Feb-24 | 5 Days | Dubai - (UAE) | ELC-0062 | |
Earthing of Electrical Networks and Equipment’s | 25-Feb-24 | 5 Days | Cairo- Egypt | ELC-0063 | |
Analytical Troubleshooting (For Engineers and Technicians Level) | 25-Feb-24 | 5 Days | Dubai - (UAE) | ELC-0064 | |
Electronic Devices | 25-Feb-24 | 5 Days | Cairo- Egypt | ELC-0065 | |
Computer Applications in Electric Power Systems | 25-Feb-24 | 5 Days | Cairo- Egypt | ELC-0066 | |
Inverters & Adjustable Induction Motors Speed | 03-Mar-24 | 5 Days | Dubai - (UAE) | ELC-0067 | |
Digital Electronic Circuits Laboratory | 03-Mar-24 | 5 Days | Cairo- Egypt | ELC-0068 | |
Advanced Electronic Circuits Laboratory | 03-Mar-24 | 5 Days | Dubai - (UAE) | ELC-0069 | |
Electrical Equipment in Hazardous Areas & Classification | 03-Mar-24 | 5 Days | Cairo- Egypt | ELC-0070 | |
Industrial Variable Speed Drivers | 03-Mar-24 | 5 Days | Cairo- Egypt | ELC-0071 | |
Maintenance of Sensitive Instruments | 03-Mar-24 | 5 Days | Cairo- Egypt | ELC-0072 | |
Maintenance of Electrical cells & Integrated Electrical Circuits | 03-Mar-24 | 5 Days | Cairo- Egypt | ELC-0073 | |
Geographic Information Systems GIS For Electrical Application | 03-Mar-24 | 5 Days | Dubai - (UAE) | ELC-0074 | |
Modern Power System Protective Relaying | 03-Mar-24 | 5 Days | Cairo- Egypt | ELC-0075 | |
Configuring and Testing Smart Field Devices | 03-Mar-24 | 5 Days | Cairo- Egypt | ELC-0076 | |
Hazards from Electrical Installations | 03-Mar-24 | 5 Days | Dubai - (UAE) | ELC-0077 | |
Liaise with operators to confirm good data of control systems | 03-Mar-24 | 5 Days | Cairo- Egypt | ELC-0078 | |
Electrical Power System Troubleshooting | 21-Apr-24 | 5 Days | Dubai - (UAE) | ELC-0079 | |
Configuration of communication protocols and system interfaces | 21-Apr-24 | 5 Days | Cairo- Egypt | ELC-0080 | |
Electrical Distribution Network Design | 21-Apr-24 | 5 Days | Kuala Lumpur | ELC-0081 | |
ELECTRICAL MOTORS, SELECTION, MAINTENANCE & CONTROL CENTERS | 21-Apr-24 | 5 Days | Dubai - (UAE) | ELC-0082 | |
Power Capacitors: Applications, Switching problems, Protection & Maintenance | 21-Apr-24 | 5 Days | Cairo- Egypt | ELC-0083 | |
Electrical Distribution Network Design | 28-Apr-24 | 5 Days | Cairo- Egypt | ELC-0084 | |
Electronic Circuits | 28-Apr-24 | 5 Days | Cairo- Egypt | ELC-0085 | |
Mechanical & Electronical Control | 28-Apr-24 | 5 Days | London - United Kingdom | ELC-0086 | |
Electrical & Electronic Instruments | 28-Apr-24 | 5 Days | Cairo- Egypt | ELC-0087 | |
Modern Industrial Control Systems | 28-Apr-24 | 5 Days | Cairo- Egypt | ELC-0088 | |
Pneumatic and Hydraulic Control Systems | 28-Apr-24 | 5 Days | Dubai - (UAE) | ELC-0089 | |
Electrical Distribution Network Design and Planning | 05-May-24 | 5 Days | Cairo- Egypt | ELC-0090 | |
Power Electronic Converters | 05-May-24 | 5 Days | Cairo- Egypt | ELC-0091 | |
Controllers & Control Loops | 05-May-24 | 5 Days | Dubai - (UAE) | ELC-0092 | |
Electrical Installations & Maintenance: Design, Inspection/Testing, Maintenance and Resilience | 05-May-24 | 5 Days | Dubai - (UAE) | ELC-0093 | |
Moving From DCS to Field Bus | 05-May-24 | 5 Days | Cairo- Egypt | ELC-0094 | |
Control Valve Actuators & Positioners | 05-May-24 | 5 Days | Kuala Lumpur | ELC-0095 | |
Design, Installation and Testing of Underground Cables | 12-May-24 | 5 Days | Cairo- Egypt | ELC-0096 | |
Operations & maintenance of high voltage circuit breakers | 12-May-24 | 5 Days | Dubai - (UAE) | ELC-0097 | |
Electrical Distribution Network Design | 12-May-24 | 5 Days | Cairo- Egypt | ELC-0098 | |
Electrical Tracing Systems | 12-May-24 | 5 Days | Cairo- Egypt | ELC-0099 | |
Protection of Electrical Power Systems | 12-May-24 | 5 Days | Kuala Lumpur | ELC-00100 | |
Electrical Drawings Schematics | 12-May-24 | 5 Days | Cairo- Egypt | ELC-00101 | |
Fuzzy Control Systems | 19-May-24 | 5 Days | Cairo- Egypt | ELC-00102 | |
Planning, Justifying, Executing Automation and Control Projects | 19-May-24 | 5 Days | Dubai - (UAE) | ELC-00103 | |
Tuning Control Loops, Feedback and Advanced Controllers | 19-May-24 | 5 Days | Cairo- Egypt | ELC-00104 | |
Digital and Analytical Industrial Instrumentations | 19-May-24 | 5 Days | Cairo- Egypt | ELC-00105 | |
33KV substation equipment (GIS switchgears, transformers, protections, etc.) | 19-May-24 | 5 Days | Cairo- Egypt | ELC-00106 | |
Configuring and Testing Smart Field Devices | 19-May-24 | 5 Days | London - United Kingdom | ELC-00107 | |
Combustion Control System | 19-May-24 | 5 Days | Cairo- Egypt | ELC-00108 | |
Electric Power Substation Engineering | 26-May-24 | 5 Days | Kuala Lumpur | ELC-00109 | |
Modern Power System Protective Relaying | 26-May-24 | 5 Days | Cairo- Egypt | ELC-00110 | |
Power Cables design testing fault location an joining techniques | 26-May-24 | 5 Days | Dubai - (UAE) | ELC-00111 | |
Programming of Computer Numerically Controlled Machines (CNC Machines) | 26-May-24 | 5 Days | Cairo- Egypt | ELC-00112 | |
Microprocessors & Applications to Control Industrial Systems | 26-May-24 | 5 Days | Cairo- Egypt | ELC-00113 | |
Industrial Process Controllers | 26-May-24 | 5 Days | Dubai - (UAE) | ELC-00114 | |
Advanced Automation Systems Using Programmable Controllers (P.L.C) | 26-May-24 | 5 Days | Cairo- Egypt | ELC-00115 | |
HV Motors & Transformers: Design, Operations & Trouble-shooting | 02-Jun-24 | 5 Days | Kuala Lumpur | ELC-00116 | |
Recent Trends of Overhead lines | 02-Jun-24 | 5 Days | Cairo- Egypt | ELC-00117 | |
Protection Relay Maintenance, Application & Testing | 02-Jun-24 | 5 Days | Cairo- Egypt | ELC-00118 | |
HDSL Installation & Setup | 02-Jun-24 | 5 Days | Dubai - (UAE) | ELC-00119 | |
Recent Trends in Maintenance of Transmission Networks | 02-Jun-24 | 5 Days | Cairo- Egypt | ELC-00120 | |
Digital and Arithmetic Systems | 09-Jun-24 | 5 Days | Cairo- Egypt | ELC-00121 | |
Adaptive Control | 09-Jun-24 | 5 Days | Dubai - (UAE) | ELC-00122 | |
Optical Fibers and Telecommunications | 09-Jun-24 | 5 Days | Cairo- Egypt | ELC-00123 | |
Emergency Power Suppliers | 09-Jun-24 | 5 Days | Dubai - (UAE) | ELC-00124 | |
Power Semiconductor Devices | 09-Jun-24 | 5 Days | Cairo- Egypt | ELC-00125 | |
Industrial Automation Using Programmable Controllers (P.L.C.) | 09-Jun-24 | 5 Days | Kuala Lumpur | ELC-00126 | |
Instrumentation and Process Control Systems | 23-Jun-24 | 5 Days | Dubai - (UAE) | ELC-00127 | |
Supervisory Control and Data Acquisition Systems SCADA | 23-Jun-24 | 5 Days | Cairo- Egypt | ELC-00128 | |
Distributed Control Systems DCS | 23-Jun-24 | 5 Days | Cairo- Egypt | ELC-00129 | |
Energy Conservation Techniques & Technology for Industry | 23-Jun-24 | 5 Days | London - United Kingdom | ELC-00130 | |
Intelligence Network in Communications | 23-Jun-24 | 5 Days | Cairo- Egypt | ELC-00131 | |
Design of Digital Mobile Radio and Antenna | 23-Jun-24 | 5 Days | Cairo- Egypt | ELC-00132 | |
Waves Spreading & Frequencies | 23-Jun-24 | 5 Days | Cairo- Egypt | ELC-00133 | |
Calibrate and Monitor Control Systems Using Simulators | 30-Jun-24 | 5 Days | Dubai - (UAE) | ELC-00134 | |
Advanced Course in PLC and SCADA System . | 30-Jun-24 | 5 Days | Cairo- Egypt | ELC-00135 | |
Rewinding of Three Phase Electric Motors | 30-Jun-24 | 5 Days | Cairo- Egypt | ELC-00136 | |
Photo Communication Networks | 30-Jun-24 | 5 Days | Dubai - (UAE) | ELC-00137 | |
Strategic Planning for Information Systems and Networks | 30-Jun-24 | 5 Days | Dubai - (UAE) | ELC-00138 | |
Safety Grounding & Power Plant Safety (Electrical Safety ) | 30-Jun-24 | 5 Days | Cairo- Egypt | ELC-00139 | |
CAT Electronic Technician | 30-Jun-24 | 5 Days | Kuala Lumpur | ELC-00140 | |
Digital and Static Protection for Electric Power Systems | 07-Jul-24 | 5 Days | Cairo- Egypt | ELC-00141 | |
Hazards of Electrical Installations | 14-Jul-24 | 5 Days | Dubai - (UAE) | ELC-00142 | |
Laser Engineering and Application | 14-Jul-24 | 5 Days | Cairo- Egypt | ELC-00143 | |
Electrical Protection Systems (Advanced) | 14-Jul-24 | 5 Days | London - United Kingdom | ELC-00144 | |
Signal and Image Processing | 14-Jul-24 | 5 Days | Kuala Lumpur | ELC-00145 | |
Medium and Low Voltage Switchgears | 14-Jul-24 | 5 Days | Cairo- Egypt | ELC-00146 | |
Electric Motors | 14-Jul-24 | 5 Days | Cairo- Egypt | ELC-00147 | |
Electronic Control of DC & AC Motors | 14-Jul-24 | 5 Days | Dubai - (UAE) | ELC-00148 | |
Production Instrumentation for Drawings | 21-Jul-24 | 5 Days | Cairo- Egypt | ELC-00149 | |
Power System Protection | 21-Jul-24 | 5 Days | Cairo- Egypt | ELC-00150 | |
Operation, Analysis, Design and Protection of Electrical Power Networks | 21-Jul-24 | 5 Days | Cairo- Egypt | ELC-00151 | |
Best Practices in Process & Electrical Instrumentation | 21-Jul-24 | 5 Days | Cairo- Egypt | ELC-00152 | |
Recent Trends of Stations Maintenance | 21-Jul-24 | 5 Days | Cairo- Egypt | ELC-00153 | |
Electrical Drawings and Documentation | 21-Jul-24 | 5 Days | Kuala Lumpur | ELC-00154 | |
Earthing of Electrical Networks and Cables | 21-Jul-24 | 5 Days | Cairo- Egypt | ELC-00155 | |
Underground Cables / Problems and Solutions | 21-Jul-24 | 5 Days | Dubai - (UAE) | ELC-00156 | |
Maintenance of Electrical Equipment and Substation | 28-Jul-24 | 5 Days | Cairo- Egypt | ELC-00157 | |
Data Communication Advanced Topics & Applications | 28-Jul-24 | 5 Days | Cairo- Egypt | ELC-00158 | |
Illumination Systems | 28-Jul-24 | 5 Days | Dubai - (UAE) | ELC-00159 | |
Process Simulation | 28-Jul-24 | 5 Days | Cairo- Egypt | ELC-00160 | |
Protection Fundamentals of E.P.S | 28-Jul-24 | 5 Days | Kuala Lumpur | ELC-00161 | |
Power Factor Improvement and Energy Conservation | 28-Jul-24 | 5 Days | Cairo- Egypt | ELC-00162 | |
Maintenance and Troubleshooting of UPS System (Uninterrupted Power Supply) and Battery Power Supply | 28-Jul-24 | 5 Days | Cairo- Egypt | ELC-00163 | |
Troubleshooting of Electrical Power System | 04-Aug-24 | 5 Days | Dubai - (UAE) | ELC-00164 | |
Distribution Networks : Operation and Maintenance | 04-Aug-24 | 5 Days | Cairo- Egypt | ELC-00165 | |
Wireline Techniques | 04-Aug-24 | 5 Days | Cairo- Egypt | ELC-00166 | |
Protective Systems of Electrical Network | 04-Aug-24 | 5 Days | Dubai - (UAE) | ELC-00167 | |
Control Centers in Distribution Networks | 04-Aug-24 | 5 Days | Cairo- Egypt | ELC-00168 | |
Recent Role of Circuit Breaker and Control | 04-Aug-24 | 5 Days | Dubai - (UAE) | ELC-00169 | |
Improving Performance of Generation Stations | 04-Aug-24 | 5 Days | Cairo- Egypt | ELC-00170 | |
Earthing of Electrical Networks and Equipment’s | 04-Aug-24 | 5 Days | Kuala Lumpur | ELC-00171 | |
Analytical Troubleshooting (For Engineers and Technicians Level) | 04-Aug-24 | 5 Days | Dubai - (UAE) | ELC-00172 | |
Electronic Devices | 11-Aug-24 | 5 Days | Cairo- Egypt | ELC-00173 | |
Computer Applications in Electric Power Systems | 11-Aug-24 | 5 Days | Cairo- Egypt | ELC-00174 | |
Inverters & Adjustable Induction Motors Speed | 11-Aug-24 | 5 Days | Cairo- Egypt | ELC-00175 | |
Digital Electronic Circuits Laboratory | 11-Aug-24 | 5 Days | Cairo- Egypt | ELC-00176 | |
Advanced Electronic Circuits Laboratory | 11-Aug-24 | 5 Days | Cairo- Egypt | ELC-00177 | |
Electrical Equipment in Hazardous Areas & Classification | 11-Aug-24 | 5 Days | Cairo- Egypt | ELC-00178 | |
Industrial Variable Speed Drivers | 11-Aug-24 | 5 Days | Dubai - (UAE) | ELC-00179 | |
Maintenance of Sensitive Instruments | 11-Aug-24 | 5 Days | Cairo- Egypt | ELC-00180 | |
Maintenance of Electrical cells & Integrated Electrical Circuits | 11-Aug-24 | 5 Days | Cairo- Egypt | ELC-00181 | |
Geographic Information Systems GIS For Electrical Application | 18-Aug-24 | 5 Days | Dubai - (UAE) | ELC-00182 | |
Advanced primary distribution stations | 18-Aug-24 | 5 Days | Dubai - (UAE) | ELC-00183 | |
Water Meters – Testing, Maintenance | 18-Aug-24 | 5 Days | Cairo- Egypt | ELC-00184 | |
Verification and Certification of Electrical Installations | 18-Aug-24 | 5 Days | Kuala Lumpur | ELC-00185 | |
The foundations of electricity, methods of protection | 18-Aug-24 | 5 Days | Cairo- Egypt | ELC-00186 | |
The basics of measuring and testing devices | 18-Aug-24 | 5 Days | Dubai - (UAE) | ELC-00187 | |
Tests and deliveries for electrical power systems | 18-Aug-24 | 5 Days | Cairo- Egypt | ELC-00188 | |
Security and electrical safety system | 18-Aug-24 | 5 Days | Cairo- Egypt | ELC-00189 | |
Protective grounding systems in electrical networks | 18-Aug-24 | 5 Days | Kuala Lumpur | ELC-00190 | |
Preparing Certified Practitioner in Energy Management Systems | 25-Aug-24 | 5 Days | Cairo- Egypt | ELC-00191 | |
Preparing a site electrical engineer | 25-Aug-24 | 5 Days | Cairo- Egypt | ELC-00192 | |
Plant electrical power operation & maintenance | 25-Aug-24 | 5 Days | Dubai - (UAE) | ELC-00193 | |
Periodic Initial Inspection, Testing and Condition Reporting | 25-Aug-24 | 5 Days | Cairo- Egypt | ELC-00194 | |
Operation of the electric power distribution network | 25-Aug-24 | 5 Days | Cairo- Egypt | ELC-00195 | |
Operation and maintenance of transformers | 25-Aug-24 | 5 Days | Cairo- Egypt | ELC-00196 | |
Occupational safety in power plants | 25-Aug-24 | 5 Days | Cairo- Egypt | ELC-00197 | |
Occupational safety from electrical hazards | 25-Aug-24 | 5 Days | Cairo- Egypt | ELC-00198 | |
Maintenance of low and medium voltage circuit breakers | 25-Aug-24 | 5 Days | Kuala Lumpur | ELC-00199 | |
Maintenance course for electrical networks | 01-Sep-24 | 5 Days | Cairo- Egypt | ELC-00200 | |
Maintenance and examination of electrical transformers | 01-Sep-24 | 5 Days | Dubai - (UAE) | ELC-00201 | |
Inspection & Maintenance for electrical networks | 01-Sep-24 | 5 Days | London - United Kingdom | ELC-00202 | |
IEC Standards Home Electrical Appliances Testing | 01-Sep-24 | 5 Days | Cairo- Egypt | ELC-00203 | |
HVAC Equipment Maintenance & Testing | 01-Sep-24 | 5 Days | Dubai - (UAE) | ELC-00204 | |
Flexible electrical network & emergency operations | 01-Sep-24 | 5 Days | Cairo- Egypt | ELC-00205 | |
Failure analysis in electrical industrial networks | 01-Sep-24 | 5 Days | Kuala Lumpur | ELC-00206 | |
EPC Contracts for power & energy projects | 01-Sep-24 | 5 Days | Cairo- Egypt | ELC-00207 | |
Electrical meter installation – maintenance & Testing | 08-Sep-24 | 5 Days | Cairo- Egypt | ELC-00208 | |
Electrical measurements and control circuits | 08-Sep-24 | 5 Days | Dubai - (UAE) | ELC-00209 | |
Electrical Equipment Safety Operation & Control | 08-Sep-24 | 5 Days | Cairo- Egypt | ELC-00210 | |
Electrical equipment and control systems | 08-Sep-24 | 5 Days | Cairo- Egypt | ELC-00211 | |
Electrical Engineering Schematics & Specification | 08-Sep-24 | 5 Days | Dubai - (UAE) | ELC-00212 | |
Electrical drawings and control systems | 08-Sep-24 | 5 Days | Cairo- Egypt | ELC-00213 | |
Electrical distribution systems | 08-Sep-24 | 5 Days | Dubai - (UAE) | ELC-00214 | |
Electrical control of auxiliary devices | 08-Sep-24 | 5 Days | Cairo- Egypt | ELC-00215 | |
Electrical cables: design – test – installation – connection | 08-Sep-24 | 5 Days | Kuala Lumpur | ELC-00216 | |
Electric power systems and data technology | 15-Sep-24 | 5 Days | Dubai - (UAE) | ELC-00217 | |
Electric power systems – protection, control | 15-Sep-24 | 5 Days | Cairo- Egypt | ELC-00218 | |
Electric motors protection and maintenance | 15-Sep-24 | 5 Days | Cairo- Egypt | ELC-00219 | |
Diagnosing & troubleshooting electrical faults | 15-Sep-24 | 5 Days | Cairo- Egypt | ELC-00220 | |
Diagnosing & troubleshooting electrical faults | 15-Sep-24 | 5 Days | Cairo- Egypt | ELC-00221 | |
Designing electrical installations in projects | 15-Sep-24 | 5 Days | Cairo- Egypt | ELC-00222 | |
Design, installation and testing of floor cables | 15-Sep-24 | 5 Days | Cairo- Egypt | ELC-00223 | |
Design and Verification of Electrical Installations | 15-Sep-24 | 5 Days | Dubai - (UAE) | ELC-00224 | |
Control and operation systems for electric lifts | 22-Sep-24 | 5 Days | Cairo- Egypt | ELC-00225 | |
Calibration and testing of digital meters | 22-Sep-24 | 5 Days | Cairo- Egypt | ELC-00226 | |
Advanced primary distribution stations | 22-Sep-24 | 5 Days | Dubai - (UAE) | ELC-00227 | |
Electrical Drawings and Documentation | 22-Sep-24 | 5 Days | Dubai - (UAE) | ELC-00228 | |
Earthing of Electrical Networks and Cables | 22-Sep-24 | 5 Days | Cairo- Egypt | ELC-00229 | |
Underground Cables / Problems and Solutions | 22-Sep-24 | 5 Days | Kuala Lumpur | ELC-00230 | |
Maintenance of Electrical Equipment and Substation | 22-Sep-24 | 5 Days | Cairo- Egypt | ELC-00231 | |
Data Communication Advanced Topics & Applications | 22-Sep-24 | 5 Days | Dubai - (UAE) | ELC-00232 | |
Illumination Systems | 29-Sep-24 | 5 Days | Cairo- Egypt | ELC-00233 | |
Process Simulation | 29-Sep-24 | 5 Days | Cairo- Egypt | ELC-00234 | |
Protection Fundamentals of E.P.S | 29-Sep-24 | 5 Days | Kuala Lumpur | ELC-00235 | |
Power Factor Improvement and Energy Conservation | 29-Sep-24 | 5 Days | Cairo- Egypt | ELC-00236 | |
Maintenance and Troubleshooting of UPS System (Uninterrupted Power Supply) and Battery Power Supply | 29-Sep-24 | 5 Days | Cairo- Egypt | ELC-00237 | |
Troubleshooting of Electrical Power System | 29-Sep-24 | 5 Days | Dubai - (UAE) | ELC-00238 | |
Distribution Networks : Operation and Maintenance | 29-Sep-24 | 5 Days | Cairo- Egypt | ELC-00239 | |
Wireline Techniques | 06-Oct-24 | 5 Days | Cairo- Egypt | ELC-00240 | |
Protective Systems of Electrical Network | 06-Oct-24 | 5 Days | Cairo- Egypt | ELC-00241 | |
Control Centers in Distribution Networks | 06-Oct-24 | 5 Days | Cairo- Egypt | ELC-00242 | |
Recent Role of Circuit Breaker and Control | 06-Oct-24 | 5 Days | Cairo- Egypt | ELC-00243 | |
Improving Performance of Generation Stations | 06-Oct-24 | 5 Days | Kuala Lumpur | ELC-00244 | |
Earthing of Electrical Networks and Equipment’s | 06-Oct-24 | 5 Days | Cairo- Egypt | ELC-00245 | |
Analytical Troubleshooting (For Engineers and Technicians Level) | 06-Oct-24 | 5 Days | Dubai - (UAE) | ELC-00246 | |
Electronic Devices | 06-Oct-24 | 5 Days | Cairo- Egypt | ELC-00247 | |
Computer Applications in Electric Power Systems | 06-Oct-24 | 5 Days | Cairo- Egypt | ELC-00248 | |
Inverters & Adjustable Induction Motors Speed | 13-Oct-24 | 5 Days | Dubai - (UAE) | ELC-00249 | |
Digital Electronic Circuits Laboratory | 13-Oct-24 | 5 Days | Cairo- Egypt | ELC-00250 | |
Advanced Electronic Circuits Laboratory | 13-Oct-24 | 5 Days | Kuala Lumpur | ELC-00251 | |
Electrical Equipment in Hazardous Areas & Classification | 13-Oct-24 | 5 Days | Cairo- Egypt | ELC-00252 | |
Industrial Variable Speed Drivers | 13-Oct-24 | 5 Days | Cairo- Egypt | ELC-00253 | |
Maintenance of Sensitive Instruments | 13-Oct-24 | 5 Days | Dubai - (UAE) | ELC-00254 | |
Maintenance of Electrical cells & Integrated Electrical Circuits | 13-Oct-24 | 5 Days | Cairo- Egypt | ELC-00255 | |
Geographic Information Systems GIS For Electrical Application | 13-Oct-24 | 5 Days | Cairo- Egypt | ELC-00256 | |
Modern Power System Protective Relaying | 13-Oct-24 | 5 Days | Dubai - (UAE) | ELC-00257 | |
Configuring and Testing Smart Field Devices | 20-Oct-24 | 5 Days | Cairo- Egypt | ELC-00258 | |
Hazards from Electrical Installations | 20-Oct-24 | 5 Days | Dubai - (UAE) | ELC-00259 | |
Liaise with operators to confirm good data of control systems | 20-Oct-24 | 5 Days | Cairo- Egypt | ELC-00260 | |
Electrical Power System Troubleshooting | 20-Oct-24 | 5 Days | Kuala Lumpur | ELC-00261 | |
Configuration of communication protocols and system interfaces | 20-Oct-24 | 5 Days | Dubai - (UAE) | ELC-00262 | |
Electrical Distribution Network Design | 20-Oct-24 | 5 Days | Cairo- Egypt | ELC-00263 | |
ELECTRICAL MOTORS, SELECTION, MAINTENANCE & CONTROL CENTERS | 20-Oct-24 | 5 Days | Cairo- Egypt | ELC-00264 | |
Power Capacitors: Applications, Switching problems, Protection & Maintenance | 20-Oct-24 | 5 Days | Cairo- Egypt | ELC-00265 | |
Electrical Distribution Network Design | 20-Oct-24 | 5 Days | Cairo- Egypt | ELC-00266 | |
Electronic Circuits | 27-Oct-24 | 5 Days | Cairo- Egypt | ELC-00267 | |
Mechanical & Electronical Control | 27-Oct-24 | 5 Days | Cairo- Egypt | ELC-00268 | |
Electrical & Electronic Instruments | 27-Oct-24 | 5 Days | Dubai - (UAE) | ELC-00269 | |
Modern Industrial Control Systems | 27-Oct-24 | 5 Days | Cairo- Egypt | ELC-00270 | |
Pneumatic and Hydraulic Control Systems | 27-Oct-24 | 5 Days | Cairo- Egypt | ELC-00271 | |
Electrical Distribution Network Design and Planning | 27-Oct-24 | 5 Days | Dubai - (UAE) | ELC-00272 | |
Power Electronic Converters | 27-Oct-24 | 5 Days | Dubai - (UAE) | ELC-00273 | |
Controllers & Control Loops | 27-Oct-24 | 5 Days | Cairo- Egypt | ELC-00274 | |
Electrical Installations & Maintenance: Design, Inspection/Testing, Maintenance and Resilience | 27-Oct-24 | 5 Days | Kuala Lumpur | ELC-00275 | |
Moving From DCS to Field Bus | 27-Oct-24 | 5 Days | Cairo- Egypt | ELC-00276 | |
Control Valve Actuators & Positioners | 03-Nov-24 | 5 Days | Dubai - (UAE) | ELC-00277 | |
Design, Installation and Testing of Underground Cables | 03-Nov-24 | 5 Days | Cairo- Egypt | ELC-00278 | |
Operations & maintenance of high voltage circuit breakers | 03-Nov-24 | 5 Days | Cairo- Egypt | ELC-00279 | |
Electrical Distribution Network Design | 03-Nov-24 | 5 Days | Kuala Lumpur | ELC-00280 | |
Electrical Tracing Systems | 03-Nov-24 | 5 Days | Cairo- Egypt | ELC-00281 | |
Protection of Electrical Power Systems | 03-Nov-24 | 5 Days | Cairo- Egypt | ELC-00282 | |
Electrical Drawings Schematics | 03-Nov-24 | 5 Days | Dubai - (UAE) | ELC-00283 | |
Fuzzy Control Systems | 03-Nov-24 | 5 Days | Cairo- Egypt | ELC-00284 | |
Planning, Justifying, Executing Automation and Control Projects | 10-Nov-24 | 5 Days | London - United Kingdom | ELC-00285 | |
Tuning Control Loops, Feedback and Advanced Controllers | 10-Nov-24 | 5 Days | Cairo- Egypt | ELC-00286 | |
Digital and Analytical Industrial Instrumentations | 10-Nov-24 | 5 Days | Cairo- Egypt | ELC-00287 | |
33KV substation equipment (GIS switchgears, transformers, protections, etc.) | 10-Nov-24 | 5 Days | Cairo- Egypt | ELC-00288 | |
Configuring and Testing Smart Field Devices | 10-Nov-24 | 5 Days | Kuala Lumpur | ELC-00289 | |
Combustion Control System | 10-Nov-24 | 5 Days | Cairo- Egypt | ELC-00290 | |
Electric Power Substation Engineering | 10-Nov-24 | 5 Days | Dubai - (UAE) | ELC-00291 | |
Modern Power System Protective Relaying | 10-Nov-24 | 5 Days | Cairo- Egypt | ELC-00292 | |
Power Cables design testing fault location an joining techniques | 17-Nov-24 | 5 Days | Cairo- Egypt | ELC-00293 | |
Programming of Computer Numerically Controlled Machines (CNC Machines) | 17-Nov-24 | 5 Days | Dubai - (UAE) | ELC-00294 | |
Microprocessors & Applications to Control Industrial Systems | 17-Nov-24 | 5 Days | Cairo- Egypt | ELC-00295 | |
Industrial Process Controllers | 17-Nov-24 | 5 Days | Kuala Lumpur | ELC-00296 | |
Advanced Automation Systems Using Programmable Controllers (P.L.C) | 17-Nov-24 | 5 Days | Cairo- Egypt | ELC-00297 | |
HV Motors & Transformers: Design, Operations & Trouble-shooting | 17-Nov-24 | 5 Days | Cairo- Egypt | ELC-00298 | |
Recent Trends of Overhead lines | 17-Nov-24 | 5 Days | Dubai - (UAE) | ELC-00299 | |
Protection Relay Maintenance, Application & Testing | 17-Nov-24 | 5 Days | Cairo- Egypt | ELC-00300 | |
HDSL Installation & Setup | 17-Nov-24 | 5 Days | Cairo- Egypt | ELC-00301 | |
Recent Trends in Maintenance of Transmission Networks | 24-Nov-24 | 5 Days | Dubai - (UAE) | ELC-00302 | |
Digital and Arithmetic Systems | 24-Nov-24 | 5 Days | Cairo- Egypt | ELC-00303 | |
Adaptive Control | 24-Nov-24 | 5 Days | Dubai - (UAE) | ELC-00304 | |
Optical Fibers and Telecommunications | 24-Nov-24 | 5 Days | Cairo- Egypt | ELC-00305 | |
Emergency Power Suppliers | 24-Nov-24 | 5 Days | Kuala Lumpur | ELC-00306 | |
Power Semiconductor Devices | 24-Nov-24 | 5 Days | Dubai - (UAE) | ELC-00307 | |
Industrial Automation Using Programmable Controllers (P.L.C.) | 24-Nov-24 | 5 Days | Cairo- Egypt | ELC-00308 | |
Instrumentation and Process Control Systems | 24-Nov-24 | 5 Days | Cairo- Egypt | ELC-00309 | |
Supervisory Control and Data Acquisition Systems SCADA | 24-Nov-24 | 5 Days | Cairo- Egypt | ELC-00310 | |
Distributed Control Systems DCS | 01-Dec-24 | 5 Days | Cairo- Egypt | ELC-00311 | |
Energy Conservation Techniques & Technology for Industry | 01-Dec-24 | 5 Days | Cairo- Egypt | ELC-00312 | |
Intelligence Network in Communications | 01-Dec-24 | 5 Days | Cairo- Egypt | ELC-00313 | |
Design of Digital Mobile Radio and Antenna | 01-Dec-24 | 5 Days | Dubai - (UAE) | ELC-00314 | |
Waves Spreading & Frequencies | 01-Dec-24 | 5 Days | Cairo- Egypt | ELC-00315 | |
Calibrate and Monitor Control Systems Using Simulators | 01-Dec-24 | 5 Days | Cairo- Egypt | ELC-00316 | |
Advanced Course in PLC and SCADA System . | 01-Dec-24 | 5 Days | Dubai - (UAE) | ELC-00317 | |
Rewinding of Three Phase Electric Motors | 08-Dec-24 | 5 Days | Dubai - (UAE) | ELC-00318 | |
Photo Communication Networks | 08-Dec-24 | 5 Days | Cairo- Egypt | ELC-00319 | |
Strategic Planning for Information Systems and Networks | 08-Dec-24 | 5 Days | Kuala Lumpur | ELC-00320 | |
Safety Grounding & Power Plant Safety (Electrical Safety ) | 08-Dec-24 | 5 Days | Cairo- Egypt | ELC-00321 | |
CAT Electronic Technician | 08-Dec-24 | 5 Days | Dubai - (UAE) | ELC-00322 | |
Digital and Static Protection for Electric Power Systems | 08-Dec-24 | 5 Days | Cairo- Egypt | ELC-00323 | |
Hazards of Electrical Installations | 08-Dec-24 | 5 Days | Cairo- Egypt | ELC-00324 | |
Laser Engineering and Application | 08-Dec-24 | 5 Days | Kuala Lumpur | ELC-00325 | |
Electrical Protection Systems (Advanced) | 08-Dec-24 | 5 Days | London - United Kingdom | ELC-00326 | |
Signal and Image Processing | 08-Dec-24 | 5 Days | Cairo- Egypt | ELC-00327 | |
Medium and Low Voltage Switchgears | 15-Dec-24 | 5 Days | Dubai - (UAE) | ELC-00328 | |
Electric Motors | 15-Dec-24 | 5 Days | Cairo- Egypt | ELC-00329 | |
Electronic Control of DC & AC Motors | 15-Dec-24 | 5 Days | Cairo- Egypt | ELC-00330 | |
Production Instrumentation for Drawings | 15-Dec-24 | 5 Days | Cairo- Egypt | ELC-00331 | |
Power System Protection | 15-Dec-24 | 5 Days | Cairo- Egypt | ELC-00332 | |
Operation, Analysis, Design and Protection of Electrical Power Networks | 15-Dec-24 | 5 Days | Cairo- Egypt | ELC-00333 | |
Best Practices in Process & Electrical Instrumentation | 15-Dec-24 | 5 Days | Kuala Lumpur | ELC-00334 | |
Recent Trends of Stations Maintenance | 15-Dec-24 | 5 Days | Cairo- Egypt | ELC-00335 | |
Electrical Drawings and Documentation | 15-Dec-24 | 5 Days | Dubai - (UAE) | ELC-00336 | |
Earthing of Electrical Networks and Cables | 22-Dec-24 | 5 Days | Cairo- Egypt | ELC-00337 | |
Underground Cables / Problems and Solutions | 22-Dec-24 | 5 Days | Cairo- Egypt | ELC-00338 | |
Maintenance of Electrical Equipment and Substation | 22-Dec-24 | 5 Days | Dubai - (UAE) | ELC-00339 | |
Data Communication Advanced Topics & Applications | 22-Dec-24 | 5 Days | Cairo- Egypt | ELC-00340 | |
Illumination Systems | 22-Dec-24 | 5 Days | Kuala Lumpur | ELC-00341 | |
Process Simulation | 22-Dec-24 | 5 Days | Cairo- Egypt | ELC-00342 | |
Protection Fundamentals of E.P.S | 22-Dec-24 | 5 Days | Cairo- Egypt | ELC-00343 | |
Power Factor Improvement and Energy Conservation | 22-Dec-24 | 5 Days | Dubai - (UAE) | ELC-00344 | |
Maintenance and Troubleshooting of UPS System (Uninterrupted Power Supply) and Battery Power Supply | 29-Dec-24 | 5 Days | Cairo- Egypt | ELC-00345 | |
Troubleshooting of Electrical Power System | 29-Dec-24 | 5 Days | Cairo- Egypt | ELC-00346 | |
Distribution Networks : Operation and Maintenance | 29-Dec-24 | 5 Days | Dubai - (UAE) | ELC-00347 | |
Wireline Techniques | 29-Dec-24 | 5 Days | Cairo- Egypt | ELC-00348 | |
Protective Systems of Electrical Network | 29-Dec-24 | 5 Days | Dubai - (UAE) | ELC-00349 | |
Control Centers in Distribution Networks | 29-Dec-24 | 5 Days | Cairo- Egypt | ELC-00350 | |
Recent Role of Circuit Breaker and Control | 29-Dec-24 | 5 Days | Kuala Lumpur | ELC-00351 | |
Improving Performance of Generation Stations | 29-Dec-24 | 5 Days | Dubai - (UAE) | ELC-00352 | |
Earthing of Electrical Networks and Equipment’s | 29-Dec-24 | 5 Days | Cairo- Egypt | ELC-00353 | |
Analytical Troubleshooting (For Engineers and Technicians Level) | 05-Jan-25 | 5 Days | Cairo- Egypt | ELC-00354 | |
Electronic Devices | 05-Jan-25 | 5 Days | Cairo- Egypt | ELC-00355 | |
Computer Applications in Electric Power Systems | 05-Jan-25 | 5 Days | Cairo- Egypt | ELC-00356 | |
Inverters & Adjustable Induction Motors Speed | 05-Jan-25 | 5 Days | Cairo- Egypt | ELC-00357 | |
Digital Electronic Circuits Laboratory | 05-Jan-25 | 5 Days | Cairo- Egypt | ELC-00358 | |
Advanced Electronic Circuits Laboratory | 05-Jan-25 | 5 Days | Dubai - (UAE) | ELC-00359 | |
Electrical Equipment in Hazardous Areas & Classification | 05-Jan-25 | 5 Days | Cairo- Egypt | ELC-00360 | |
Industrial Variable Speed Drivers | 05-Jan-25 | 5 Days | Cairo- Egypt | ELC-00361 | |
Maintenance of Sensitive Instruments | 12-Jan-25 | 5 Days | Dubai - (UAE) | ELC-00362 | |
Maintenance of Electrical cells & Integrated Electrical Circuits | 12-Jan-25 | 5 Days | Dubai - (UAE) | ELC-00363 | |
Geographic Information Systems GIS For Electrical Application | 12-Jan-25 | 5 Days | Cairo- Egypt | ELC-00364 | |
Advanced primary distribution stations | 12-Jan-25 | 5 Days | Kuala Lumpur | ELC-00365 | |
Water Meters – Testing, Maintenance | 12-Jan-25 | 5 Days | Cairo- Egypt | ELC-00366 | |
Verification and Certification of Electrical Installations | 12-Jan-25 | 5 Days | Dubai - (UAE) | ELC-00367 | |
The foundations of electricity, methods of protection | 12-Jan-25 | 5 Days | Cairo- Egypt | ELC-00368 | |
The basics of measuring and testing devices | 12-Jan-25 | 5 Days | Cairo- Egypt | ELC-00369 | |
Tests and deliveries for electrical power systems | 19-Jan-25 | 5 Days | Kuala Lumpur | ELC-00370 | |
Security and electrical safety system | 19-Jan-25 | 5 Days | Cairo- Egypt | ELC-00371 | |
Protective grounding systems in electrical networks | 19-Jan-25 | 5 Days | Cairo- Egypt | ELC-00372 | |
Preparing Certified Practitioner in Energy Management Systems | 19-Jan-25 | 5 Days | Dubai - (UAE) | ELC-00373 | |
Preparing a site electrical engineer | 19-Jan-25 | 5 Days | Cairo- Egypt | ELC-00374 | |
Plant electrical power operation & maintenance | 19-Jan-25 | 5 Days | Cairo- Egypt | ELC-00375 | |
Periodic Initial Inspection, Testing and Condition Reporting | 19-Jan-25 | 5 Days | Cairo- Egypt | ELC-00376 | |
Operation of the electric power distribution network | 19-Jan-25 | 5 Days | London - United Kingdom | ELC-00377 | |
Operation and maintenance of transformers | 19-Jan-25 | 5 Days | Cairo- Egypt | ELC-00378 | |
Occupational safety in power plants | 19-Jan-25 | 5 Days | Kuala Lumpur | ELC-00379 | |
Occupational safety from electrical hazards | 19-Jan-25 | 5 Days | Cairo- Egypt | ELC-00380 | |
Maintenance of low and medium voltage circuit breakers | 26-Jan-25 | 5 Days | Dubai - (UAE) | ELC-00381 | |
Maintenance course for electrical networks | 26-Jan-25 | 5 Days | Cairo- Egypt | ELC-00382 | |
Maintenance and examination of electrical transformers | 26-Jan-25 | 5 Days | Cairo- Egypt | ELC-00383 | |
Inspection & Maintenance for electrical networks | 26-Jan-25 | 5 Days | Dubai - (UAE) | ELC-00384 | |
IEC Standards Home Electrical Appliances Testing | 26-Jan-25 | 5 Days | Cairo- Egypt | ELC-00385 | |
HVAC Equipment Maintenance & Testing | 26-Jan-25 | 5 Days | Kuala Lumpur | ELC-00386 | |
Flexible electrical network & emergency operations | 26-Jan-25 | 5 Days | Cairo- Egypt | ELC-00387 | |
Failure analysis in electrical industrial networks | 26-Jan-25 | 5 Days | Cairo- Egypt | ELC-00388 | |
EPC Contracts for power & energy projects | 26-Jan-25 | 5 Days | Dubai - (UAE) | ELC-00389 | |
Electrical meter installation – maintenance & Testing | 02-Feb-25 | 5 Days | Cairo- Egypt | ELC-00390 | |
Electrical measurements and control circuits | 02-Feb-25 | 5 Days | Cairo- Egypt | ELC-00391 | |
Electrical Equipment Safety Operation & Control | 02-Feb-25 | 5 Days | Dubai - (UAE) | ELC-00392 | |
Electrical equipment and control systems | 02-Feb-25 | 5 Days | Cairo- Egypt | ELC-00393 | |
Electrical Engineering Schematics & Specification | 02-Feb-25 | 5 Days | Dubai - (UAE) | ELC-00394 | |
Electrical drawings and control systems | 02-Feb-25 | 5 Days | Cairo- Egypt | ELC-00395 | |
Electrical distribution systems | 02-Feb-25 | 5 Days | Kuala Lumpur | ELC-00396 | |
Electrical control of auxiliary devices | 02-Feb-25 | 5 Days | Dubai - (UAE) | ELC-00397 | |
Electrical cables: design – test – installation – connection | 02-Feb-25 | 5 Days | Cairo- Egypt | ELC-00398 | |
Electric power systems and data technology | 02-Feb-25 | 5 Days | Cairo- Egypt | ELC-00399 | |
Electric power systems – protection, control | 09-Feb-25 | 5 Days | London - United Kingdom | ELC-00400 | |
Electric motors protection and maintenance | 09-Feb-25 | 5 Days | Cairo- Egypt | ELC-00401 | |
Diagnosing & troubleshooting electrical faults | 09-Feb-25 | 5 Days | Cairo- Egypt | ELC-00402 | |
Diagnosing & troubleshooting electrical faults | 09-Feb-25 | 5 Days | Cairo- Egypt | ELC-00403 | |
Designing electrical installations in projects | 09-Feb-25 | 5 Days | Dubai - (UAE) | ELC-00404 | |
Design, installation and testing of floor cables | 09-Feb-25 | 5 Days | Cairo- Egypt | ELC-00405 | |
Design and Verification of Electrical Installations | 09-Feb-25 | 5 Days | Cairo- Egypt | ELC-00406 | |
Control and operation systems for electric lifts | 09-Feb-25 | 5 Days | Dubai - (UAE) | ELC-00407 | |
Calibration and testing of digital meters | 16-Feb-25 | 5 Days | Dubai - (UAE) | ELC-00408 | |
Advanced primary distribution stations | 16-Feb-25 | 5 Days | Cairo- Egypt | ELC-00409 | |
Electrical Drawings and Documentation | 16-Feb-25 | 5 Days | Kuala Lumpur | ELC-00410 | |
Earthing of Electrical Networks and Cables | 16-Feb-25 | 5 Days | Cairo- Egypt | ELC-00411 | |
Underground Cables / Problems and Solutions | 16-Feb-25 | 5 Days | Dubai - (UAE) | ELC-00412 | |
Maintenance of Electrical Equipment and Substation | 16-Feb-25 | 5 Days | Cairo- Egypt | ELC-00413 | |
Data Communication Advanced Topics & Applications | 16-Feb-25 | 5 Days | Cairo- Egypt | ELC-00414 | |
Illumination Systems | 16-Feb-25 | 5 Days | Kuala Lumpur | ELC-00415 | |
Process Simulation | 16-Feb-25 | 5 Days | Cairo- Egypt | ELC-00416 | |
Protection Fundamentals of E.P.S | 16-Feb-25 | 5 Days | Cairo- Egypt | ELC-00417 | |
Power Factor Improvement and Energy Conservation | 23-Feb-25 | 5 Days | Dubai - (UAE) | ELC-00418 | |
Maintenance and Troubleshooting of UPS System (Uninterrupted Power Supply) and Battery Power Supply | 23-Feb-25 | 5 Days | Cairo- Egypt | ELC-00419 | |
Troubleshooting of Electrical Power System | 23-Feb-25 | 5 Days | London - United Kingdom | ELC-00420 | |
Distribution Networks : Operation and Maintenance | 23-Feb-25 | 5 Days | Cairo- Egypt | ELC-00421 | |
Wireline Techniques | 23-Feb-25 | 5 Days | Cairo- Egypt | ELC-00422 | |
Protective Systems of Electrical Network | 23-Feb-25 | 5 Days | Cairo- Egypt | ELC-00423 | |
Control Centers in Distribution Networks | 23-Feb-25 | 5 Days | Kuala Lumpur | ELC-00424 | |
Recent Role of Circuit Breaker and Control | 23-Feb-25 | 5 Days | Cairo- Egypt | ELC-00425 | |
Improving Performance of Generation Stations | 02-Mar-25 | 5 Days | Dubai - (UAE) | ELC-00426 | |
Earthing of Electrical Networks and Equipment’s | 02-Mar-25 | 5 Days | Cairo- Egypt | ELC-00427 | |
Analytical Troubleshooting (For Engineers and Technicians Level) | 02-Mar-25 | 5 Days | Cairo- Egypt | ELC-00428 | |
Electronic Devices | 02-Mar-25 | 5 Days | Dubai - (UAE) | ELC-00429 | |
Computer Applications in Electric Power Systems | 02-Mar-25 | 5 Days | Cairo- Egypt | ELC-00430 | |
Inverters & Adjustable Induction Motors Speed | 02-Mar-25 | 5 Days | Kuala Lumpur | ELC-00431 | |
Digital Electronic Circuits Laboratory | 02-Mar-25 | 5 Days | Cairo- Egypt | ELC-00432 | |
Advanced Electronic Circuits Laboratory | 09-Mar-25 | 5 Days | Cairo- Egypt | ELC-00433 | |
Electrical Equipment in Hazardous Areas & Classification | 09-Mar-25 | 5 Days | Dubai - (UAE) | ELC-00434 | |
Industrial Variable Speed Drivers | 09-Mar-25 | 5 Days | Cairo- Egypt | ELC-00435 | |
Maintenance of Sensitive Instruments | 09-Mar-25 | 5 Days | Cairo- Egypt | ELC-00436 | |
Maintenance of Electrical cells & Integrated Electrical Circuits | 09-Mar-25 | 5 Days | Dubai - (UAE) | ELC-00437 | |
Geographic Information Systems GIS For Electrical Application | 09-Mar-25 | 5 Days | Cairo- Egypt | ELC-00438 | |
Modern Power System Protective Relaying | 09-Mar-25 | 5 Days | Dubai - (UAE) | ELC-00439 | |
Configuring and Testing Smart Field Devices | 16-Mar-25 | 5 Days | Cairo- Egypt | ELC-00440 | |
Hazards from Electrical Installations | 16-Mar-25 | 5 Days | Kuala Lumpur | ELC-00441 | |
Liaise with operators to confirm good data of control systems | 16-Mar-25 | 5 Days | Dubai - (UAE) | ELC-00442 | |
Electrical Power System Troubleshooting | 16-Mar-25 | 5 Days | Cairo- Egypt | ELC-00443 | |
Configuration of communication protocols and system interfaces | 16-Mar-25 | 5 Days | Cairo- Egypt | ELC-00444 | |
Electrical Distribution Network Design | 16-Mar-25 | 5 Days | Cairo- Egypt | ELC-00445 | |
ELECTRICAL MOTORS, SELECTION, MAINTENANCE & CONTROL CENTERS | 16-Mar-25 | 5 Days | Cairo- Egypt | ELC-00446 | |
Power Capacitors: Applications, Switching problems, Protection & Maintenance | 16-Mar-25 | 5 Days | Cairo- Egypt | ELC-00447 | |
Electrical Distribution Network Design | 23-Mar-25 | 5 Days | Cairo- Egypt | ELC-00448 | |
Electronic Circuits | 23-Mar-25 | 5 Days | Dubai - (UAE) | ELC-00449 | |
Mechanical & Electronical Control | 23-Mar-25 | 5 Days | Cairo- Egypt | ELC-00450 | |
Electrical & Electronic Instruments | 23-Mar-25 | 5 Days | Cairo- Egypt | ELC-00451 | |
Modern Industrial Control Systems | 23-Mar-25 | 5 Days | Dubai - (UAE) | ELC-00452 | |
Pneumatic and Hydraulic Control Systems | 23-Mar-25 | 5 Days | Dubai - (UAE) | ELC-00453 | |
Electrical Distribution Network Design and Planning | 23-Mar-25 | 5 Days | Cairo- Egypt | ELC-00454 | |
Power Electronic Converters | 23-Mar-25 | 5 Days | Kuala Lumpur | ELC-00455 | |
Controllers & Control Loops | 30-Mar-25 | 5 Days | Cairo- Egypt | ELC-00456 | |
Electrical Installations & Maintenance: Design, Inspection/Testing, Maintenance and Resilience | 30-Mar-25 | 5 Days | Dubai - (UAE) | ELC-00457 | |
Moving From DCS to Field Bus | 30-Mar-25 | 5 Days | Cairo- Egypt | ELC-00458 | |
Control Valve Actuators & Positioners | 30-Mar-25 | 5 Days | Cairo- Egypt | ELC-00459 | |
Design, Installation and Testing of Underground Cables | 30-Mar-25 | 5 Days | Kuala Lumpur | ELC-00460 | |
Operations & maintenance of high voltage circuit breakers | 30-Mar-25 | 5 Days | Cairo- Egypt | ELC-00461 |